"So, assumptions have been made, and the story is we're closed, and we're not." Erik Swope-Wise has worked at Urban Native Store inside WestShore Plaza for six years. He said this to Bay News 9 in late July, a few weeks after Tampa's oldest mall sold to a developer that plans to tear it down.
Three months later, the confusion he described is easy to see. Headlines said the mall would be demolished. The documents filed since then describe something slower and more piecemeal. The plan breaks the site into blocks that can each move on its own schedule, and so far no date has been set for any of them. Anyone in Westshore who still catches a movie at the AMC or books a table at Maggiano's is using a mall that has a buyer, an approved concept and a pending rezoning, but no closing date.
How the Sale Unfolded
The order of events matters, because each step has been read as more final than it was.
- 1967. WestShore Plaza opens and becomes the region's first fully air-conditioned indoor mall.
- 2024. The City of Tampa approves the previous owner's plan to rezone the site for shops, restaurants, offices, apartments, medical offices, recreation and a bus station.
- July 16, 2026. Third Lake Partners announces it will redevelop the site with Echelon, a developer based in St. Petersburg. It says timing, design and phasing details will come later.
- July 2026. The deed records the purchase from Washington Prime Group at $135 million, according to Tampa Bay Beacons. Bay News 9 put the figure at $134 million.
- July 29, 2026. Tenants tell Bay News 9 they are still open and still have no word on when they will have to leave.
- August 2026. The new owner files to rezone the property in a way that lets it be redeveloped one section at a time.
Step six is the one that matters most for anyone who still shops there.
Fourteen Blocks Means No Single Last Day
Tampa Bay Business & Wealth reports that the filing would change the site's zoning from Planned Development to Planned Development Alternative. It splits the roughly 53-acre property into 14 development blocks linked by a new network of internal streets. The magazine notes this would let the company move individual sections forward separately. The existing mall could be demolished "in part or entirely" as redevelopment reaches each area.
The filing doesn't add to what can be built. It keeps the approved totals, which are up to 1,765 residences, a 240-room hotel, about 900,000 square feet of retail and 500,000 square feet of office and medical space. What it changes is how those rights can be spread across the site, so the owner can sequence the different uses as each block is designed.
The same report states, "No timetable has been set for demolition or construction. Each phase would require additional city review before work begins."
Taken together, a building that sits on a block nobody has designed yet keeps operating until that block's plan has gone through city review. Under a 14-block structure, the mall can lose one section while other sections stay open. Westshore residents have been bracing for one big closure, and the filed plan is built to avoid one.
Westshore Alliance Executive Director Michael Maurino described what was public in July as "kind of boxes on a map," with "no tenants identified." He also said parts of the 2024 approval allow for public uses such as green space, a movie theater and a concert venue, according to Bay News 9.
What the Mall's Directory Still Lists
The mall has lost Sears, Macy's and Dick's Sporting Goods in recent years, and that is the image most people carry of it. WestShore Plaza's own directory tells a fuller story. As of mid-October 2026, it still lists these names:
- AMC WestShore 14
- JCPenney, with a listed phone number of (813) 286-7111
- Maggiano's Little Italy
- Seasons 52
- P.F. Chang's
- Kura Revolving Sushi Bar
- Grimaldi's Pizzeria
- Curry Leaves Indian Cuisine
A directory is the mall's own listing. It is not a promise that every door is open at a given hour, so calling ahead before a special trip is sensible. Still, two entries show tenants making plans that run past the sale headlines.
Curry Leaves moved into a larger space at 204 Westshore Plaza and held its grand opening on August 9, 2025, according to Creative Loafing Tampa Bay. That was a decision to grow at this address. The directory also shows a tenant called Milano Exchange marked "Opening Soon!"
The restaurants on the list are mostly the ones that ring the outside of the building, and they are what keeps the property busy at night. Swope-Wise told Bay News 9 that losing the anchor stores had hurt foot traffic, and that misinformation since the sale had led people to assume the mall was closed.
International Plaza Is Moving the Other Way, and Its Dates Slip Too
International Plaza, at 2223 N. West Shore Blvd., is in a different phase entirely. In July, Tampa Bay Business & Wealth reported seven brands coming to the region for the first time. It also reported that existing tenants were growing: Lululemon and David Yurman were expanding their stores, and Kay Jewelers had relocated within the mall.
Even a growing mall runs behind its announcements. The table compares what was announced in July with what Simon's center page shows now.
| Brand | July 2026 announcement | Status on Simon's page now |
|---|---|---|
| BRITTO, Bissinger's Handcrafted Chocolatier, Rowan | Open | Reported open in July |
| Vuori | Expected this summer | Now Open |
| Ceviche Tapas Bar and Restaurant | Expected this summer | Coming Soon |
| Pottery Barn | Scheduled for fall | Coming Soon |
| Pottery Barn Kids, Kendra Scott | Scheduled for fall | On the way, no date listed |
Simon has also announced a 50,000-square-foot open-air expansion at International Plaza and a rework of Bay Street's dining and gathering area. Construction was expected to begin in 2026.
Midtown Tampa follows the same pattern. Pura Vida Miami, CorePower Yoga and The Shade Store have signed leases there, and as of July they were expected to open later in 2026 or early 2027, with no exact dates.
So schedules in Westshore are loose in both directions. The openings at International Plaza and Midtown arrive later than announced. The closure at WestShore Plaza hasn't been given a date at all, and its filed structure lets it happen in pieces. For anyone planning a Saturday on West Shore Boulevard, what a property currently lists is a better guide than a headline about it.
The Filings That Will Show Real Change
Since every phase needs more city review, the first real sign that part of WestShore Plaza is closing will be a block-specific plan going through that review. A news story that repeats the sale won't tell you that. Third Lake has said it will announce timing, design and phasing details as planning moves forward. The City of Tampa posted its 2026–27 zoning hearing schedule on October 14. The Westshore Alliance supports the project and has said it hopes the plan will include new convention space.
For now, the facts fit in one sentence. WestShore Plaza has a new owner, an approved concept for up to 1,765 homes and a hotel, and a pending filing that divides it into 14 blocks, but no announced date for any of its tenants to leave. Our Westshore neighborhood page and our earlier look at redevelopment sites in Westshore cover the bigger corridor this project belongs to.
The WestShore Plaza redevelopment is the largest change to Westshore's commercial core in decades, and it will be phased over years, not finished in one season. If you own nearby and want a clear view of how a block-by-block rebuild could affect your property's timing and value, KVA Group follows each filing as it moves. Request a Confidential Consultation.